Agent Fleet Runtime — Work Record

Intent​

Build the Agent Fleet Runtime: role-based durable build execution, ephemeral independent review, and upstream preservation of development history and engineering contracts. Design of record: specification v2 in the project repo. The fleet works in the open (to the owner) through an in-repo llm-kanban board — charter first, stories with points and acceptance criteria, sprints, reviews, retros.

Status​

building — baseline gate closed 2026-10-03 (the gate had held since 2026-09-12). Sprint 2026-S02 closed early 2026-10-04 (9 of 9 points). Sprint 2026-S03 closed 2026-10-04 on scope completion (10 of 10 committed points accepted: AF-06 routing/assignment via PR #39, AF-07 assignment-bound review receipts via PR #40 — the M1 contract spine is merged to main). Sprint 2026-S04 closed 2026-10-04 on scope completion (12 of 12 committed points accepted; AF-43 also completed at program level). Sprints 2026-S05 and 2026-S06 closed on scope completion; the Fleet Framework Codification program was accepted 2026-10-06 at its AF-42 gate. Roles: Justin is stakeholder/product owner; Maverick (muse-vm-01) is coordinator, PM, and scrum master; Iceman (hermes-jkdev001-01) is host operator on jkdev001.

Decisions​

DateDecisionWhy / rejected alternative
2026-10-03Muse (Maverick) takes over the build under llm-kanbanJustin's directive; the AF program was harvested, not restarted — rejected restarting the program under its old machinery
2026-10-03D1: spec v2 approved as design of recordOwner approval of the baseline gate package; aligns the paper with the method already in use
2026-10-03D2: characterized baseline accepted as baseline of recordInventories reproduce exactly and CI is green at exact head; the recovered code itself remains unaccepted
2026-10-03D3: AF-02 custody — 4 live-host captures stay local-only permanently; sanitized lineage suffices (no vetted history export); 19 changed incumbent files get a separate bounded-review storyHighest leak surface closed off; lineage value preserved without a 934-object review
2026-10-03Agents work weekends; sprints start when ready, not on weekdaysOwner directive; Sprint 2026-S01 started and closed the same evening

Progress log​

2026-10-03​

  • Takeover executed: charter, takeover record, and llm-kanban board published in the repo; all 36 AF program tasks imported as stories (AF-01…AF-36); GitHub issues remain the historical scope record.
  • Iceman delivered the AF-02 host inventory within hours (docsite record, merged as docsite PR #3); PM classification published: the 157 deferred originals are the project's paper trail, not code.
  • Sprint 2026-S01 executed and closed early, 8 of 8 points: AF-01 tracker reconciliation (zero discrepancies), AF-03 baseline reproduced with CI established (durable suite green at exact head, run 37172451794), AF-04 approval package. Issues #1, #3, #4 closed. Retro filed with three action items backlogged.
  • Sprint 2026-S02 planned (9 of 13 points): AF-05 claimed and built — the program-era candidate reconciled, the missing controlled_integrator core role added, review findings remediated — PR #38 opened with green CI.
  • This work record created (the project page was missed at queue time; owner rule applied retroactively the same day).

2026-10-04​

  • Sprint 2026-S02 closed early at the owner's direction, 9 of 9 points: AF-05 merged (PR #38, issue #5 closed), AF-38 approved by the owner and recorded as ADR-001 (spec section 6 note resolved), AF-39 method docs published (evidence-environment rule; custody inventory template). Retro filed with two action items backlogged.

  • Sprint 2026-S03 started the same day: AF-06 (routing and resolved assignment, 5 pts) carried in and in progress; AF-07 (assignment-bound review receipts, 3 pts) committed; AF-08 (neutral delivery phases, 5 pts) groomed as stretch.

  • Project pages for this and the other active initiatives were created in the docsite (owner rule), after the owner flagged the miss.

  • Fleet alerting and comms: an hourly fleet-update job posts to the owner's chat; failure alerts go by email and to the owner's Slack channel. Each host's agents get a Slack channel named by callsign; #maverick (knashboard.slack.com) is the Maverick host's channel, with a watcher so owner messages there reach the chief of staff.

  • Agent naming standard v2 adopted by the owner: agent names are <callsign>-<type>-<role>-<numeric>; the v1 <vendor>-<host>-<nn> IDs remain the host-instance registry layer. The Maverick host now runs three persistent agents: maverick-muse-chief_of_staff-001 (decisions, fleet management), maverick-muse-scrum_master-001 (kanban boards, handoffs), and maverick-muse-worker-001 (writes code for this build). Migration published the same day: naming standard and fleet registry updated in the docsite; the new names registered in both boards' kanban/agents.yaml.

  • Sprint 2026-S03 execution restructured under the new model: the scrum master owns board truth and handoffs; the worker takes AF-06 by reclaim (the original claim lease had lapsed) and reconciles the preserved candidate under the AF-05 pattern.

  • Fleet Framework Codification program approved by the owner ("Make it happen") and filed in the repo as docs/FLEET-FRAMEWORK-PLAN-2026-10-04.md: seven vendor-neutral roles (chief_of_staff, scrum_master, worker, planner, code_quality_reviewer, security_reviewer, sweeper) working through three layers — bootstrap adapter (five supplies: registered name, fleet repo, role runbook path, skills library pointer, fail-closed escalation) / repo role runbooks / docsite canonical method. Nine stories created on the board by the scrum master, groomed to the Definition of Ready and held in the backlog for sequencing into Sprint 2026-S04 at S03 close (AF-40…AF-48, 31 pts): role runbooks + adapter contract, desk bootstraps, full import of all 428 Hermes skills into docs/15-skills/ (owner decision: import ALL, including the two previous exclusions), roles: frontmatter, generated skills index + per-role manifests, instantiation of the four new roles, the sweeper live (daily + post-sprint + on-demand; mechanical consistency committed directly, semantic changes proposed), and the ontology foundation (new docs/16-ontology/, hybrid concept pages + YAML triples register; phase 1 agent estate only). AF-42 (cold-start proof) is the program acceptance gate.

  • Sprint 2026-S03 CLOSED 2026-10-04 on scope completion — 10 of 10 committed points accepted. AF-06 (versioned routing and resolved assignment) merged via PR #39 and AF-07 (assignment-bound review receipts) via PR #40 (merge d9cbdf44, 2026-10-04T21:01:37Z); issues #6/#7 closed. AF-07 was re-estimated 3 → 5 mid-sprint when the stage/attempt routing extension (Option A: port into main's routing_policy.py) was added by chief-of-staff decision; its preserved candidate was ported onto merged main, the VERDICT-02 findings remediated, and a fresh-context two-phase review returned APPROVE-WITH-FINDINGS (0 blocking, 2 LOW). Final suite: 105 tests. Retro: kanban/retros/2026-S03.md — includes a claim-race incident (a worker claim push built on a pre-decision story file overwrote the PM's re-estimate commit; detected on readback and repaired surgically) whose tooling fix is filed as story AF-49 (kanban.py claim/push staleness guard). Framework execution began during S03: AF-43 (skills import) in progress under the chief of staff's claim, AF-40 (role runbooks) ready.

  • Sprint 2026-S04 under way (2026-10-04); AF-08 accepted. Neutral delivery phases built by the worker on work/AF-08/delivery-02 from the preserved delivery-01 candidate (seam characterized as non-structural; VERDICT-03 findings NF-R1…NF-R4 remediated), fresh-context review APPROVE-WITH-FINDINGS (0 blocking/medium), suite 147 tests, and merged via PR #41 (merge 4f21d67cd3); issue #8 closed. S04 committed progress: 5 of 12 points done. AF-40/AF-41 remain gated on the stakeholder's AF-43 acceptance, which also frees the chief of staff's claim slot.

  • Sprint 2026-S04 CLOSED 2026-10-04 on scope completion — 12 of 12 committed points accepted (AF-08 delivery phases via PR #41; AF-40 framework runbooks + adapter contract; AF-41 desk bootstraps — all three VM desks now run bootstrap → runbook → work). AF-43 counted at program level. In-window, the fleet also grew: maverick-muse-finance-001 created and registered. Retro: kanban/retros/2026-S04.md (lessons: MDX compile gate before bulk publish; format standard set at drafting time; per-file publishing race = AF-49). Sprint 2026-S05 planned in the same pass (goal: skills become role-addressable; the four remaining framework roles stand up): committed AF-44 (roles: frontmatter, 3), AF-45 (instantiate planner/code_quality_reviewer/security_reviewer/sweeper, 2), AF-46 (skills index + per-role manifests, 3) = 8 of 13; stretch AF-49 (staleness guard, groomed + estimated at 3) then AF-47 (sweeper live, 3); AF-42 (cold-start proof, program gate) and AF-48 (ontology phase 1) are the following sprint's known shape.

  • Sprint 2026-S05 CLOSED 2026-10-05 on scope completion — 19 of 19 working-scope points accepted (committed AF-44 roles: frontmatter, AF-45 four framework desks instantiated + registered, AF-46 generated skills index + 8 per-role manifests = 8 of 8; directed pull-ins AF-49 staleness guard (AO PR #42 + dashboard PR #1 merged; the guard has already refused a stale desk push in production), AF-50 fleet workflow codified (docsite docs/09-runbooks/fleet-workflow.md + operating primitives in all seven role runbooks, PR #43), AF-47 sweeper live (daily cadence job sweeper-daily-consistency; first pass zero drift; 4 decision-queue entries all dispositioned and applied) = 11 of 11, against the 13-point planning capacity, recorded unsmoothed). The sprint's central process event: the §3 reviewer dispatch stalled on AF-50 when a desk held the packet for stakeholder confirmation (root-caused to the runtime instruction hierarchy, bootstrap fail-closed wording, and the AF-45 stand-up precedent); the stakeholder's remedy — a standing authorization settling provenance (chain-of-command dispatch is a desk's orders by charter; fail-closed covers method only) — is recorded in FLEET.md and every desk bootstrap, and AF-47 ran the corrected pattern end-to-end. The stakeholder also directed a sweeper destructive-action protocol (chief-approved every time, archive-first, 7-day hold). Program-level in-window: AF-51 (AF-50's review findings) closed under §7.2 chief acceptance (PR #44); the AF-02 remainder closed on the PM-verified Iceman export (36 of 37 documents; one owner-accepted exclusion); AF-37 unblocked on Iceman's delivered match table (12 match / 19 changed) and readied. Retro: kanban/retros/2026-S05.md. Sprint 2026-S06 planning opens with its shape decided: AF-37 (bounded review, export-then-review per the chief's routing call), AF-48 (ontology phase 1), AF-42 (cold-start proof, program acceptance gate, sequenced last).

  • Sprint 2026-S06 CLOSED 2026-10-06 on scope completion — 13 of 13 points accepted (committed AF-48 ontology foundation (docsite docs/16-ontology/: concept standard, nine seed concepts, 15-triple register, validator clean; §3 dual APPROVE), AF-37 bounded review of the 19 changed incumbent originals (export-then-review; report in-repo; the loaded service plausibly matches the changed set; no code accepted), AF-42 cold-start proof = 11 of 11; stretch AF-55 docsite-publish staleness guard = 2 of 2, §3 evidence-based form's first live use). AF-42's acceptance by the stakeholder (2026-10-06) is the Fleet Framework Codification PROGRAM ACCEPTANCE: the framework proved itself cold — the worker, both reviewers, and the sweeper all executed from bootstrap + runbook alone, and the sprint's friction logs produced nine v0.2 runbook fixes (PR #48, merged 42a654f32194) with exactly one named exit (the shared incremental sync tool, backlog AF-56). In-window change-loop completions: AF-52 (provenance codification), AF-53 (§3 no-PR codification), AF-54 (status-aware kanban.py release/reclaim — the remedy for S06's AF-48 review-wait release incident). Retro incl. the program retrospective: kanban/retros/2026-S06.md. Sprint 2026-S07 planning dispatched to the planner immediately on close (velocity directive).

  • Sprint 2026-S07 CLOSED 2026-10-06 on scope completion — 13 of 13 points accepted; milestone M1 COMPLETE (AF-09 durable role-based handoffs (PR #49 merged 76afdf63a218; the preserved candidate reconciled, NEW-BLOCKING-1's publish-before-certify ordering defect closed by store-ordering in both publication tails; §3 dual APPROVE with discrimination swaps run by both reviewers), AF-10 vertical-slice review acceptance (PR #50 merged 2d462548e386; two configured identities through the same gates path, configuration only, spoof controls refused at the gate, six implementation modules hash-pinned; §3 dual APPROVE), AF-56 the shared incremental sync tool (AF-42's named exit discharged: ~/workspace/skills/fleet-sync/, read-only, per-blob hash-verified, manifest-incremental; §7.2 chief acceptance)). The sprint also carried the CI episode end to end: the zero-step failures were diagnosed to Justin's GitHub Actions minutes cap (confirmed by him; budget added; execution verified green), and by his directive ci.yml now runs exactly two jobs (project tests + board validation) with the testing discipline codified in the worker runbook (primitive 4). Two process records stand in the retro (kanban/retros/2026-S07.md): standing planning rule #1 (review-wait still blocks dependents' claims — AF-10's first claim was correctly refused until AF-09 was done) and the scrum master's board-fetch truncation incident with its adopted practice change (count + validate before any render push; fleet-sync for board fetches). Sprint 2026-S08 opens immediately: AF-57 first (re-scoped 2 pts: path-scoping of the two surviving CI jobs + cancel-in-progress), then AF-11/AF-12 on the M2 spine, AF-27 at the M5 head once its re-groom lands; AF-58 (test-coverage audit) dispatched to the worker at this close.

  • Sprint 2026-S08 CLOSED 2026-10-07 on scope completion — 12 of 12 committed points accepted (AF-57 CI trigger scoping (2): the two surviving jobs path-scoped via a routing job in the single ci.yml, both names verbatim, the verification matrix completed post-merge by a fleet-triggered workflow_dispatch run; PR #51 merged cb862b448958 — AF-11 runtime adapter boundary (5): the generic Controller returns invocation data and never executes; credential values never read; every denial arm test-driven; the dispatch-authority mapping adjudicated as faithful reuse of the retained grant table at both §3 gates, with security's watch note preserved on the story; PR #56 merged 5ed86ccb17 — AF-12 assignment-based process census (5): assignment records as the root of trust, verdicts fail-closed; the packet review's F-01 High (input-order-dependent verdicts from duplicate assignment PIDs) remediated in-PR by refusing the ambiguity at input validation and closed three independent times by permutation sweeps (720 / 240 / 144 orderings); PR #57 merged 40b703e4e4). All three post-merge CI runs success; the three stakeholder actions consumed in the planned sequence under standing planning rule #1 (the serialized claim chain produced zero refused claims — S07's lesson applied in the plan). The AF-27 re-groom landed in its first window as a jointly-owned tracked item (S09's groomed M5 head); AF-58's test-coverage audit completed in-window under §7.2 (suite healthy over src/ at 86–98%; kanban.py at 74% with its gaps filed as captures AF-59..AF-66, plus AF-67 for a containment-normalization nit in landed code). In-window the skill-utilization codification was approved (§7.2) and filed as AF-68 (8) → AF-69 (5), and the ponytail packet shape was adopted for S09 dispatches. Retro: kanban/retros/2026-S08.md. Sprint 2026-S09 opens immediately: AF-27 + AF-13 as the runtime spine, the codification sequence behind them.

  • Sprint 2026-S09 CLOSED 2026-10-07 on scope completion — 26 of 26 committed points accepted (AF-27 preservation and artifact contracts (5, M5 head): five schema families as versioned machine-readable schemas with a fail-closed stdlib validator, negative tests, and a requirements coverage audit; security APPROVE no findings, CQ APPROVE-WITH-FINDINGS with one Low dispositioned to a post-merge direct-lane follow-on; PR #58 merged 64efc04b5feb, post-merge CI success — AF-13 role/capability admission and reserve (8, M2 spine): capacities, single-use reserves bound to policy version and digest, authority rechecked at execution, launches bound to the AF-12 census through the AF-11 adapter only, under the closed AF-11 vocabulary (AC 9 verified mechanically at §3: grant table byte-identical); dual APPROVE no findings; PR #59 merged 54372e8a6b84, post-merge CI success; AF-67's containment-normalization nit absorbed as AC 10 and closed as superseded, carrying security's refinement that AF-11's original root-"/" edge inverted the filing's direction finding — AF-68 + AF-69 skill-utilization codification (8 + 5, accepted by the chief under §7.2): every role runbook now names its load-bearing skills inline in its operating primitives or states none explicitly, the docsite roles: tags and per-role manifests agree with the namings, and the first utilization-check pass ran as AF-69's acceptance test (19 namings resolving on runbook ↔ tag ↔ manifest, zero unresolved); PR #60 merged 878b7019eb, PR #61 merged 30fa7420a4ce at its §3-amended head). The AF-27 F-01 follow-on (guard deduplication, CQ-verified behavior-identical by differential probe) landed as PR #62 merged d8b50e95de78. The sprint's retro (kanban/retros/2026-S09.md) carries four process items stated plainly: a merge executed by the scrum desk on the chief's authorization that the chief withdrew as an overreach (the acceptance stood; the pause is now fleet law in FLEET.md — a desk directed to execute a stakeholder-reserved merge holds and confirms first); a worker claim incident from a stale board copy (self-disclosed, verified content-neutral); the branch-tree seam (verification binds to the branch tree, not the build tree — the catch that closed AF-69's CQ F-01 by changing bytes, not claims); and a duplicated high-priority merge email (verification of a send is by listing only). One tooling capture filed: AF-70 (first-class superseded close for unestimated captures, after AF-67's close tripped the estimate-on-exit rule and briefly reddened board-validation CI; fix 42102468a7, green run 37676307936). Sprint 2026-S10 proposal routed to the planner at close (backlog inputs: AF-59..AF-66 coverage captures, M2 and M5 continuation).

  • Sprint 2026-S10 CLOSED 2026-10-07 on scope completion — 19 of 19 committed points accepted, no stretch pulled (the board tooling's named coverage debt, closed in full: AF-70 first-class superseded close for unestimated captures (3) — the honest replacement for AF-67's nominal-estimate workaround, its estimate waiver claimable only under a four-part conjunction; AF-59 claim-gate refusal matrix (3), AF-63 move-guard tests (3), AF-66 reclaim-guard tests (2), AF-64 validate/render census (3): every claim/move/reclaim refusal branch and every validate error/warning class in kanban.py is now pinned by a discriminating or single-defect test, the census verified by three independent enumerations across the packet review and both section-3 lenses; composed suite 332 passed + 357 subtests, composition proven by CI run 37691063281 on the all-merges head — plus AF-14 coordinator policy resolution (5, M2 spine): the coordinator invokes the planner role end to end, policy-resolved with nothing hard-coded, admission-bound through AF-13, receipts binding the host-observed identity with mismatch refusing; sizing validated at 5 twice (planner re-groom + worker claim seam), the dormant 14a/14b split never tripped; dual section-3 APPROVE with the identity claim attacked firsthand at both gates; PR #67 merged db43bdea1ad5 by the stakeholder as his acceptance, post-merge CI success). Process records of the sprint (retro: kanban/retros/2026-S10.md): the stakeholder delegated the tooling-story merges mid-sprint ("Delegate the tooling-story merges to you; AF-14 stays mine.") and the scrum master executed all five under that delegation (PRs #63, #64, #65, #66, #68 — each head verified against its section-7.2-accepted head at merge time), the four merge emails already sent standing on the stories' records as overtaken by his decision; AF-63's section-3 produced the two-lens convergence of record (security's Low on the unpinned absence of a PM-seat bypass on done, CQ's same negative space recorded as an observation — the remediation verified by both lenses against their own bypass mutants); two behaviors were pinned as characterizations under the DOCUMENT standard (the board loader's silent drop of frontmatter-less files — the change is filed as AF-71; cmd_reclaim's unknown-story crash — filed as AF-72 with security's sibling-shape sharpening on its record); and the scrum master's disclosed Evidence-section miss at AF-64's readying, whose fix (the header census runs inside the readying move itself) was accepted by the chief. Planning tasks landed in-window: AF-14's re-groom and AF-28's re-groom (8 points, the capture half of spec section 5 — AF-28 stands READY as Sprint 2026-S11's M5 head). Sprint 2026-S11 opens immediately on this close.

  • Sprint 2026-S11 CLOSED 2026-10-07 (CDT; closes stamped 2026-10-08 UTC) on scope completion — 16 of 16 committed points accepted, no stretch pulled (AF-28 workspace capture (8, M5 capture half of spec section 5): fence verification, declared-scope inventory, classification-driven exclusion, a three-phase torn guard, and a deletion-aware commit from a throwaway index, records bound to AF-27 custody as local_only; the packet review's two Moderates shared one root — a HEAD-seeded index is additive-only, so an excluded tracked file's bytes rode into the checkpoint tree until scope-vs-HEAD removals closed it; section 3's two Lows closed at the stronger remedy (staging verified payloads), so the guarantee and the mechanism are the same size; PR #69 merged 3ebf1a2afe6a by the stakeholder as his acceptance — AF-71 (2) and AF-72 (1), the board tooling's last two named defects, closing its named-defect list EMPTY: the loader now names unloadable story files through validate's existing error form (section 3's one Low — the empty/unterminated-frontmatter reason attribution — closed by reason-selection in the loader, its divergence of record resolved when CQ withdrew its leave-it judgment on its own published premise), and cmd_reclaim gained the family's literal unknown-story guard (dual APPROVE, no findings; security fuzzed the composed tree); both merged by the scrum master under the tooling delegation on the chief's section-7.2 acceptance (PR #70 5a7420464f94, PR #71 4732cdf00a) — AF-15a recovery and the controller journal (5, M2; the AF-15 split's first half, priced by the re-groom before commitment): admission state survives restart on an append-only journal with strict typed replay and an anchored head; section 3 produced the program's first section-4b loop run end to end — security's 1361-offset truncation sweep verified every internal defect and then found the boundary defect (a whole-entry rollback revives a consumed reserve; single-use fails open while an absent journal fails closed), graded High; the planner's change plan (external head anchor recommended over a ruled threat-model acceptance) was approved by the chief on AF-15b's inheritance (budgets read the journal's counts; under the acceptance a stale restore would silently rewind them), implemented as one combined amended head (anchor + single-writer contract text + trust-levels prose), and re-verified firsthand (every prefix refuses; the revival probe dies at open; no effect escapes unanchored). A post-binding plan-conformance refinement by the worker (byte-level prefix recovery for torn tails) moved the bound head and triggered the full correction protocol: gate report re-issued at the binding head da3311a484d4, both desks re-bound, and a round-2 reconciliation of record establishing that the first build had under-implemented the plan's crash-window case and that round 2 had verified the build against its own contract rather than the plan — yielding two fleet disciplines (a section-4b delta is bound against the plan's text, not the module's own contract; when two stated rules can collide, a binding probe must force the collision, not sample the agreement) and the frozen-head corollary. PR #72 merged cc5656f5003b by the stakeholder as his acceptance). Planning yield in-window: the AF-15 split (AF-15a 5 / AF-15b 5) priced before commitment; AF-29 groomed at 8 from spec section 5's scan paragraph. Retro: kanban/retros/2026-S11.md. Sprint 2026-S12 opens immediately: AF-15b (5, M2 head — budgets and escalation lineage) and AF-29 (8, M5 head — the publication-gate secret scan), both READY with dependencies satisfied.

  • Sprint 2026-S12 CLOSED 2026-10-08 on scope completion — 13 of 13 committed points accepted, no stretch pulled (AF-15b budgets and escalation lineage (5, M2 — completing the AF-15 split): budget caps read from the assignment's contract/policy inputs and enforced at the invocation boundary, attempts counted from AF-15a's anchored journal only (no cache, no second store), escalations recorded as the journal's fifth entry form chaining the lineage's attempts with their resolved role/route/policy binding (re-resolution checks consistency, never authenticity — the M2 watch note as a criterion, proven by a forged-receipt fixture); sizing validated at claim (5 = 3+1+1), the M2 line's fourth consecutive agreement; the in-PR packet review found and remediated a High (a delegation-retry bypass) and its re-check closed APPROVE-WITH-FINDINGS; PR #73 merged ffb3fa644698 by the stakeholder as his acceptance. Recorded plainly in the retro: the chartered section-3 dispatch did not fire for AF-15b before the stakeholder's merge — AF-29's incident consumed the scrum master's sequence — and the sequence is stated on the story; the desk's corrective discipline (section-3 packets fire in the same desk-turn as handoff consolidation) is in force from this close — AF-29 pre-publication safety boundary (8, M5's publication gate): complete newly reachable object-set scanning over local git objects with typed rejection classes, verdicts as AF-27 custody records validated against AF-27's schemas at issuance and never quoting content, quarantine discipline structural (the module's only git verbs are read-only), fail-closed on every unscannable shape, published-history secrets routed as incidents. Its gen-1 claim was lost to a session interruption before any heartbeat landed (AF-73 captures the heartbeat gap; the lease-expiry alert was the backstop and the build was recovered byte-identical from its branch, the review chain re-run rather than presumed — the re-run caught three defects the earlier remediation itself had introduced). Section 3 dual APPROVE-WITH-FINDINGS at the built delta (AF-28's planted symlink-label note discharged by probing at this, its first load-bearing consumer: the scan discriminates from tree modes and supplied classifications are additive only); the two Lows (a filename-channel finding quoting the token it classified; spawn-level git failures escaping as exceptions) plus the F-08 amendment landed in one pre-announced head movement: git-lfs pointers became a seventh named rejection class (unscanned_referenced_content, ruling (a) on the planner's change plan — the exposure definitional, not live, no LFS existing anywhere in the checkpoint flow) at the ambiguity tier, referent never consulted; both desks re-bound the amended head against the plan's text; PR #74 merged f547cc5151fc by the stakeholder as his acceptance). AF-15's stub was closed in the close-out as superseded by AF-15b under AF-70's tooling, both halves merged and accepted — the AF-15 line is formally complete. Retro: kanban/retros/2026-S12.md. Sprint 2026-S13 planning cycle opens: AF-30 (M5's publication half; depends_on AF-29, satisfied; its grooming inherits the gate final on pointers, no LFS obligation) and AF-16 (depends_on AF-15b, satisfied) are the natural heads; AF-73 (the claim-heartbeat capture) goes to the planner's grooming judgment alongside them.

  • Sprint 2026-S13 CLOSED 2026-10-08 on scope completion — 15 of 15 committed points accepted, no stretch pulled (AF-30 durable push and exact remote readback (8, M5's publication half — completing the custody chain AF-28 captures, AF-29 judges, AF-30 preserves): verdict-gated, intent-before-push publication over an idempotent queue, remote_verified only on exact ref + exact SHA + fetchability proven in a fresh throwaway object store. Its section-3 round is the sprint's defining event: dual APPROVE was reported, then the security reviewer probed the chief's replayed-queue-entry supplement and reproduced F1 (High) at full strength — the verdict gate was consumed at QUEUE TIME ONLY, so a checkpoint re-scanned and quarantined after queueing still published on its persisted intent and was marked verified. Security withdrew its gate, the chief withdrew the merge recommendation to the stakeholder before he acted, the scrum master's over-wide consolidation sentence was corrected on the record in quoted terms, and the direct-lane remedy re-consumed the gate against each intent's current record at the moment of publication (a new refused outcome; the record-flip made structurally impossible). The gate re-bound on a full re-verification at the amended head; the operating standard produced — a gate consumed at any moment other than the moment of the act it guards is a claim about the past, not a control on the present — is fleet standing. PR #75 merged a456f291c2b0 by the stakeholder as his acceptance — AF-73 claim heartbeat gap (2, board tooling; S12's retro action capture): claims and reclaims are born on a 1-hour first lease (claim.first_lease_hours), the first heartbeat promoting to the full 4h steady state, heartbeat's code untouched; dual section-3 APPROVE with the grant-site census verified by exhaustive grep (exactly three lease writes in the tool) and the fencing core byte-identical to main; accepted by the chief under section 7.2, PR #76 merged 2e35eb9f09d0 by the scrum master under the tooling delegation at the verified head. Its first production exercise came inside the same sprint: AF-16's claim was born on the 1h lease and promoted by its claim-time heartbeat — AF-16 stop and revocation lifecycle (5, M2): revocation_recorded and cancellation_recorded as journal forms with enforcement in replay (future-commit forms refuse typed under a revoked binding — admission refusing by construction through replay, its own file byte-unchanged — while completions of pre-revocation launches land as resolutions); the uncertain set derived from replayed in-flight state, stopped claimed only when it empties (the no-false-stopped-claim criterion as a forcing fixture family); cancellation through an injected boundary only, ambiguous outcomes recorded uncertain, never cancelled. The four AF-15b retro-review riders rode as NAMED criteria and were verified as criteria by its section 3 (R1 the weld as an assertion at launch_planner reading the reserve's ref from the ledger's own snapshot — the silent fail-open now unrepresentable at that boundary; R2 the precedence paragraph + pins on both adjacencies + corrected catalogue; R3 the attribution restatements, census zero; R4 the duplicated guard deleted). PR #77 merged 6cc86735235a by the stakeholder as his acceptance). Planning tasks completed in-sprint: the AF-16 re-groom (provisional 5 held, riders folded in whole) and the AF-31 re-groom (approved outright by the chief, the section-5 admission-hold reading ruled as behavior; AF-31 stands READY as S14's groomed M5 head). The section-3 same-turn discipline (S12 retro) held across all three stories. CORRECTION (sweeper DQ-2026-10-08-01, the chief's disposition, called out for verification): the Blockers line below carried AF-37 as ready and waiting on Iceman's export; that has been stale since S06 — AF-37's bounded review COMPLETED in Sprint 2026-S06 (see the S06 entry above; the story file records it done, completed 2026-10-05) — and the line is corrected in this close. Retro: kanban/retros/2026-S13.md. Standing change landing with S14: under the stakeholder's standing merge delegation of 2026-10-08, story merges from S14 onward execute on fleet hands (the scrum master's or the chief of staff's) on dual section-3 clearance + the chief's recorded acceptance + CI green at the dual-bound head, the head verified against the accepted head at merge time (for runtime stories the chief's acceptance under this delegation stands in for merge-as-acceptance, recorded on the story as accepted under the standing merge delegation of 2026-10-08); escalations still route to the stakeholder — issues and decisions only, never a clean green merge. Sprint 2026-S14 planning follows the standing flow: the planner's proposal is requested with AF-31 as its groomed M5 head, AF-17 and AF-32 as candidate heads, and the unpulled stretch stories returned to the planner's judgment.

  • Sprint 2026-S14 CLOSED 2026-10-09 on scope completion — 22 of 22 committed points accepted, no stretch named (AF-31 custody admission and cleanup gates (5, M5 head): admission deriving publication health at the decision moment from AF-30's publish journal, cleanup re-reading the retention record fresh at the act; two packet-review rounds and the F2 amendment round closed in-lane; PR #78 — AF-17 role-based operational prompts and reporting (5): model-named workflow instructions removed from prompt surfaces, exact observed execution identity visible, statuses derived from evidence read at report time, receipt discipline by re-resolution; security's F1 and CQ's F-01 closed in the section-4a lane at the amended head; PR #79 — AF-32 versioned engineering artifact registry (5): schema-bound append-only registration, version discipline derived never flagged, custody resolved at read from the current custody record; security's F1 (the read join validated the joined record's family but never bound it to the artifact's own keys) closed in-lane; PR #80 — the tooling tail AF-60 heartbeat tests (2), AF-61 new-story creation tests (2), AF-62 status command tests (1), AF-65 delivery-contract load() rejection classes (2): PRs #81–#84). With AF-65, the AF-58 audit line is closed — every refusal in kanban.py, every validate class, every status filter, and every load() rejection class is now pinned by a test that fails without it (composed suite 553 passed + 359 subtests at close). S14 is the first full sprint under the stakeholder's standing merge delegation of 2026-10-08 — stakeholder actions 0: all seven merges executed on fleet hands (the scrum master's) at dual-bound heads verified full-SHA at merge time, the runtime stories accepted by the chief under the delegation, the tail under section 7.2. The sprint's defining rounds: AF-31's F2 (security amended its own concurrence after a byte-level probe — the recover() abort left a failure unrecorded; the scrum master's consolidation was corrected on the record in quoted terms; the worker's execution crossed the desk's hold and the moved head was bound as it stood under the preservation doctrine; the chief's reconciliation sustained F2, his acceptance a separate act) and AF-61's criterion ruling (a duplicate-refusal gap stated at claim before the build; the chief ruled it a characterization under the AF-64 pattern, the refusal build filed as AF-75 with the remedy shape, its landing flipping both characterization pins). Two record incidents, one mechanism — a base check validates the sha you name, not the bytes you hold: AF-17's heartbeat clobber (the worker's two-call fetch racing the desk's push; its one-fetch fix verified in production) and AF-60's stale-mirror reversions (the scrum master's own pushes built on an unsynced mirror; disclosed on the story, restored forward with no history rewritten; desk rules strengthened — record-base and story edits only on a same-sequence-synced mirror, the frontmatter in every story readback). Security's AF-31 F1 (the terminal-refused composition) was dispositioned by the planner and ruled by the chief (option (a): an append-only retirement act with cited evidence) and stands as AF-31a, a prepared S15 input alongside AF-74 (groomed, 2 pts) and AF-75 (filed, unestimated). Retro: kanban/retros/2026-S14.md (action items A1–A2 backlogged 2026-10-09: runbook codification of the same-sequence sync rule; section-3 queue visibility after AF-32's verdict waited ~9h in an honestly-ordered queue). Velocity 22 (S13 15, S12 13, S11 16, S10 19, S09 26). Sprint 2026-S15 planning follows the standing flow on this close.

Blockers / open items​

  • No board blockers. (Corrected at the S13 close, 2026-10-08, per sweeper DQ-2026-10-08-01: AF-37's bounded review completed in Sprint 2026-S06 and its story stands DONE, completed 2026-10-05 — the earlier form of this line, carrying AF-37 as ready and waiting on Iceman's export, was stale and is replaced.)
  • Sprint 2026-S15: planning follows the standing flow on S14's close (2026-10-09, 22 of 22) — prepared inputs: AF-31a (the terminal-refused retirement act; planner draft approved by the chief, 3 pts; files in board form on S15's proposal approval), AF-74 (checkpoint_publish malformed-record remedy; groomed and approved, 2 pts), AF-75 (cmd_new/write_story existence refusal; filed, unestimated). Story merges execute on fleet hands under the stakeholder's 2026-10-08 standing delegation (dual section-3 + the chief's recorded acceptance + CI green at the bound head).

Published by Muse · 2026-10-03.