One play from the tronghieu/agent-skills scrum-master set (MIT), imported on its own (owner-approved acquisition, gap report row 18). The set's init script and its other plays are NOT imported. Fleet note: this fleet's sprints close on scope completion, not on a calendar; read any fixed-cadence wording accordingly — it has been stripped where the source carried it.
Anti-patterns — the catalog, and how to scan for them
Process rot is gradual, so the people inside can't see it. The workspace can. This reference powers two plays: health-scan (read the history, name what it shows) and coach (have the conversation about one pattern well).
Running a health-scan
- Read everything: all close snapshots,
retros.md,impediments.md, recent pulse logs,context.mdagreements. - Compute the trends the catalog needs: velocity, carry-over %,
added-mid-sprint, goal streak,
PI#completion rate, impediment ages. - Walk the catalog. A pattern is reported only with two or more
cited instances — sprint numbers,
PI#ids, dated lines. One occurrence is an event; two is a candidate; three is a pattern. No evidence, no claim. - Write
health-<date>.md— dated, kept, never overwritten:
# Health scan — 2026-08-31
Headline: <one sentence — the single most expensive pattern>
## Patterns found
### <name>
- Evidence: S09 carry-over 38% (snapshot), S10 41%, S11 35%
- Cost: <what it is doing to the team, concretely>
- Smallest fix: <one experiment, one sprint>
- The conversation: <2–3 sentence script the user can say>
## Watch list
<candidates with only one instance — named, not diagnosed>
## What's healthy
<name it, with sources — a mirror that only shows damage gets ignored>
- In the reply: headline, the top pattern with its evidence, and the one conversation to have first. Not the whole scan.
The catalog
Each entry: the workspace signal, the cost, and the conversation — because the coach play's output is a conversation, not a rule.
Goal-less sprints
- Signal: sprint files with no goal, or goals like "do the tickets"; ★ marks missing.
- Cost: nothing to say no with — every interruption is equally valid; review has nothing to demo against.
- Conversation: "What would make sprint N a success in one sentence, to someone outside the team? Let's plan backward from that."
Carry-over normalization
- Signal: carry-over ≥ ~30% in 3+ consecutive snapshots, and planning keeps committing the same amount.
- Cost: commitment stops meaning anything; forecasts inherit the lie.
- Conversation: "We plan 34 and land 21, three sprints running. Plan 21 and finish — or find what's eating the 13?"
Silent scope morph
- Signal: delivered stories that never appeared in a committed table;
empty
SC#sections beside diverging numbers; added-mid-sprint high in every snapshot. - Cost: the team absorbs work invisibly; planning learns nothing.
- Conversation: "Mid-sprint asks are real — let's make them cost something visible. One in, one out, written down."
Retro theater
- Signal:
PI#completion under ~50% across 3 retros; the same theme in 3 retro records; audits that keep finding "untouched". - Cost: the team learns retro promises are decorative; honest input dries up.
- Conversation: "One improvement next retro, not three — and it gets sprint capacity like a story. Deal?"
Status-theater daily
- Signal: pulse logs are per-person status lists; zero
IM#ever born from a daily while carry-over stays high. - Cost: fifteen minutes daily spent reporting up instead of unblocking sideways; blockers surface at review.
- Conversation: "Walk the board, not the room — what's stuck and what's in the way, per ★ story, not per person?"
Velocity worship
- Signal: velocity climbing while goal streak worsens; estimates inflating (same-shaped stories growing points across sprints).
- Cost: the number improves, the product doesn't; estimates become negotiation chips.
- Conversation: "Velocity is our thermometer, not our grade. Which ★ outcomes shipped?"
Hero pattern
- Signal: one name owns most ★ stories across snapshots; impediments cluster around one person's availability.
- Cost: bus factor of one; the hero burns out; others stop growing.
- Conversation: "A-line work goes through Minh every sprint. Pairing on the next one — cheaper than the week we lose when Minh is out?"
Zombie backlog
- Signal: planning after planning flags the same readiness failures — no estimates, no AC, giant stories pulled anyway.
- Cost: planning becomes estimation-under-pressure; sprints start half-blind.
- Conversation: "An hour of refinement mid-sprint buys back the first two days of the next one. Try it for one sprint?"
Impediment rot
- Signal: median open
IM#age above sprint length; items nudged 3+ times without state change;owner: NONElines surviving sweeps. - Cost: the team routes around blocks permanently; escalation muscles atrophy.
- Conversation: "IM-4 is older than the sprint. Escalate it today, or decide out loud that we accept it and stop paying attention tax."
Watermelon reporting
- Signal: a report or status claim says on-track while the same-day snapshot shows ★ stories not started, or numbers with no source.
- Cost: the one pattern that kills trust in everything else.
- Conversation: "Say 'at risk' while it's cheap. The report that survives an audit is the one worth sending."
Coaching with the catalog
- One pattern at a time. Change capacity is smaller than analysis capacity. Name the most expensive one; park the rest on the watch list.
- Smallest experiment, one sprint, revisit date — written into
context.mdagreements or aPI#, so the next scan can check it. - Coach, don't police. The catalog names team habits, not villains. The conversation scripts offer a change; the team's "no" is a legitimate answer — record it and re-raise when the cost has data behind it.